Commit Graph
2 Commits
Author SHA1 Message Date
torstenandCopilot 062bf8f96e Qt6 migration verification: RTI 7.7 Pro integration and path fixes
Major changes:
- Merged branches: feature/arcgis300-symbology-migration, feature/lts-viewer-validation-testing-phase, bugfix/fix-warning-issue
- Integrated RTI 7.7 Pro commercial library with proper CMake configuration
- Fixed all hardcoded /workspace paths to use /repo (Docker mount point)
- Added DOCKER_MOUNT_ROOT parameter to new_docker_build.sh for configurable mount points
- Fixed RPATH configuration for proper runtime library loading

Technical fixes:
- cmake/FindRTI.cmake: Set CMP0111 policy unconditionally, fixed IMPORTED_LOCATION property setting outside target creation block, added debug logging
- CMakeLists.txt: Added CMP0111 before find_package(RTI), updated path detection for /repo, configured RPATH
- Lts/DDS/CMakeLists.txt: Reordered DdsUnitTests before DdsUnitTestsPlaceholder to fix test executable naming
- ArcGIS symbology: Removed deprecated m_sssResult and m_esriSwatchTaskUuid members (ArcGIS 300 API changes)

Build verification:
- 10 CPU build: 100% success (error fixing phase)
- 1 CPU build: 100% success (final validation)
- CTest: 675 tests run, 97% pass rate (654/675 passed)
- RTI DDS integration test: PASSED

Known issues:
- 21 tests failed (mostly 'Not Run' for missing smoke test executables)
- Timeout issues in bld_bsm_test and taboc_serialtest (connection refused errors)

Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
2026-11-04 09:04:01 +00:00
torsten 8cec9973e7 Migration of Legatus codebase to Qt6 with RTI Connext DDS 7.7 integration is partially complete. Core DDS targets build successfully, but ProjectDataManagement module blocks full ddsfts compilation due to IDL definition conflicts. 2026-09-07 19:36:21 +02:00