# Release 2 Validation Build Plan ## Objective Execute final validation build for Release 2 using the adapted `new_docker_build_release2.sh` script. ## Release 2 Scope ### AP3 - Shared Libraries - LtsUtils - Widgets (nglwidgets) - Session (tcpserver) - Krypto (wms_json_ds) - PluginManager ### AP4 - DDS Middleware - ddscore - svcCoreClient - ddsftccore - ddsfts - ddsgen - ddsQoS - ddsconnector ### AP9 - Tools and Translations - DdsView - LogViewer - SqlBrowser - DaoGenerator - lupdate toolchain ## Build Targets (35 total) ### DDS Middleware (AP4) - 7 targets 1. ddscore 2. svcCoreClient 3. ddsftccore 4. ddsfts 5. ddsgen 6. ddsQoS 7. ddsconnector ### NGL Libraries (Shared Utilities) - 16 targets 8. NGLLogger 9. nglapplication 10. nglcompression 11. nglcoreapplication 12. ngldb 13. nglguiapplication 14. nglsettings 15. nglsingleapplication 16. nglsinglecoreapplication 17. ngltools 18. ngltranslator 19. nglwidgets 20. qtsingleapplication 21. qtsinglecoreapplication 22. wms_json_ds 23. tcpserver ### Lts/Common Libraries (AP3) - 3 targets 24. LtsCoordTrans 25. LtsLicence 26. LtsUtils ### Test Executables - 2 targets 27. lts_coord_trans_unit_test 28. ngltools_qt_smoke ### Tools (AP9) - 5 targets 29. ddsView 30. logViewer 31. sqlBrowser 32. DaoGenerator 33. lupdate ## Script Adaptations Completed ### Changes Made to new_docker_build_release2.sh 1. ✅ Replaced GROUP* arrays with single RELEASE_BUILD_TARGETS array 2. ✅ Removed ALL svc* services (not in Release 2 scope) 3. ✅ Included only Release 2 scope targets (35 total) 4. ✅ Matched apt package list from reference script 5. ✅ Used same Docker inline script approach 6. ✅ Updated project name to "guez" (default) 7. ✅ Updated Docker image name to "guez-qt6:1.0" 8. ✅ Ensured all flags work: - --build-prebuilt-image - --delete-prebuilt-image - --run-jenkins-builder - --run-coverage (mutually exclusive with --run-jenkins-builder) ### Script Validation - ✅ Syntax check passed (bash -n) - ✅ Line count: 612 lines (similar to reference script's 647 lines) - ✅ Structure matches reference script from story/release-validation-scope ## Build Execution Plan ### Phase 1: Prebuilt Image Build ```bash cd qt-migration-legatus/qt6-after/qt6-migrated-legatus ./new_docker_build_release2.sh --build-prebuilt-image ``` Expected duration: 10-15 minutes Expected outcome: Docker image guez-qt6:1.0 created ### Phase 2: Release Build (Jenkins Builder) ```bash ./new_docker_build_release2.sh --run-jenkins-builder ``` Expected duration: 30-45 minutes Expected outcome: DEB packages created in packages-out/ ### Phase 3: Cleanup ```bash sudo rm -rf build4_* deb_build_tmp_* deb_stage_* packages-out ``` Note: Requires sudo due to root-owned directories from Docker builds ## Validation Criteria ### Success Criteria - [ ] All 35 targets build successfully - [ ] DEB packages created in packages-out/ - [ ] No critical build errors - [ ] Test executables compile (ctest can run) - [ ] No missing dependencies ### Known Exclusions (Out of Scope) - All svc* services (except svcCoreClient which is part of DDS middleware) - EvalApps - Test directories - LastTestAuswertung - .envrc ## Reporting ### Build Report Sections 1. Build Summary - Start/end times - Total duration - Success/failure status 2. Target Build Status - List of all 35 targets - Build status (SUCCESS/FAILED/SKIPPED) - Build duration per target 3. Package Output - List of generated DEB packages - Package sizes - Location 4. Issues Encountered - Build errors - Missing dependencies - Resolution steps 5. Recommendations - Next steps - Known issues - Follow-up tasks ## Rollback Plan If build fails: 1. Check build logs in build4_*/ directory 2. Identify failing target 3. Verify target is in Release 2 scope 4. If missing dependency, add to APT_PACKAGES array 5. Re-run build with --delete-prebuilt-image first ## Environment Requirements - Docker installed and running - Sufficient disk space (20GB+ recommended) - rti_license.dat file available - MIGRATE_PIPELINE_ROOT environment variable set - Network access for apt package downloads --- *Created: 2026-11-13* *Branch: story/create-release-two-delivery-25_11_2026*